Plan a change
Turn a goal into requirements and a plan, or review an existing specification without implementing it.
Use Whiteboard when the goal or important choices still need work. Implementation plans default to a temporary Markdown file, with a short summary and its absolute path in chat. Exploration and review-only answers stay conversational. To settle an interactive experience before its implementation plan, prototype the UI change and bring the approved reference and handoff. Requirements exploration can still come first. A task you already understand can go straight to Execute.
You need Whiteboard installed in your assistant. For existing code, give it access to the repository; a new product needs no checkout. Examples here are assistant requests, not terminal commands.
1. State the goal and limits
/woostack-whiteboard Plan a Verification section for our README. The readers are
contributors who need to know which checks to run before submitting a change.
Use the repository's existing commands and reuse useful content. Return a plan
and a visual where it helps; do not edit repository files or publish issues.Describe who has the problem, how they handle it now, what should improve, and the hard constraints and non-goals. Whiteboard treats a proposed feature as a starting point and checks whether removal, reuse, or a smaller change would serve the goal. For documentation, name the reader and what they should be able to do. Whiteboard inspects available evidence and resolves consequential choices during planning, not execution. Consequential product choices affecting behavior, acceptance, permissions, data handling, compatibility, cost, or recovery need an answer from you or an explicitly authorized delegate before dependent implementation is ready. Reversibility does not authorize a default. Routine implementation and design details within agreed behavior do not need an interview. This includes minor wording or spacing changes that preserve meaning and constraints. No questions are required when the context is complete. Presentation and interactions already settled by an approved prototype remain requirements, not open implementation preferences.
For requirements exploration alone, say Compare approaches without choosing an architecture or creating implementation tasks. For a review, supply the plan and ask for discrepancies and
recommended corrections only. Neither request requires a new implementation plan.
2. Refine the behavior
Open the returned path in your Markdown reader. The file contains the complete plan, including its visual, decisions, acceptance, and unresolved questions. Whiteboard updates that same file as decisions change and reads back each saved revision; chat gives you the status rather than repeating the plan. Ask for the full plan in chat if you prefer.
Whiteboard starts with a working hypothesis and recommended direction based on available evidence. It explains alternatives and trade-offs, asks focused questions, and updates the plan from your answers until it is ready for handoff or you direct otherwise. A blocker prompts the next question or a request for missing evidence. Ask it to walk through a concrete case if the recommendation is unclear. For the README example:
Walk through how a contributor chooses checks for a wording-only change.
What should the README say if a documented command is missing?The assistant checks material transitions: the trigger, who may act, the result, and side effects. It probes partial success, retry, cancellation, or interruption where those could change the outcome. Correct the scope or assumptions as needed. This is a concrete walkthrough, not an exhaustive checklist. During implementation planning, the assistant keeps its visual model and text consistent. Your host can use a readable text diagram when it cannot render the preferred format.
A technically feasible feature may still fail to help its users. Whiteboard distinguishes these product assumptions from feasibility and proposes learning or success evidence when it matters to the direction. It does not invent agreed metrics or require analytics or experiments for every change. Proposed learning remains a plan, not permission to run a test.
If your host supports delegation, you can authorize read-only scouts for independent questions:
Use read-only scouts to inspect the existing check commands and contributor guidance.
Return source evidence, uncertainty, and recommendations. Do not edit, experiment, or publish.Whiteboard chooses useful capacity, reconciles findings and conflicts, and brings material questions to you. If optional scouting is unavailable, it inspects inline. Scouts cannot authorize behavior; they are not workers running proposed feasibility tests.
3. Check the plan
Ask Whiteboard to challenge consequential assumptions with concrete counterexamples. For the README example, a recommended check might exist but omit the files being changed. Expect material findings with evidence or a labeled assumption, consequences, and the smallest correction or question. A review may find no material issues. When another perspective could change a consequential decision, you can authorize a separate read-only reviewer of the saved plan. Whiteboard gives it the complete artifact and primary sources, without planning history, previous reviewer verdicts, or leading approval framing. It leaves that revision unchanged until review finishes. If the reviewer cannot access the file, it receives the exact full plan inline. Limited context separation or a failed review must be reported, not treated as independent proof. Check each correction's effects on requirements, dependencies, acceptance, and the visual. Reviewer agreement alone is not verification.
Before handing it off, check that:
- Functional and nonfunctional requirements, constraints, and non-goals are distinct from preferences and proposed defaults.
- Consequential choices have reasons. Material questions are answered or explicitly deferred by you, including any necessary later investigation. If you stop early, the result is a draft.
- Open questions name needed evidence, the decision owner, resolution condition, and affected dependents. Dependent implementation stays unready; independent ready portions remain usable.
- In-scope areas that cannot yet be framed as questions stay deferred, with the upstream answer needed to clarify them. They are separate from non-goals and speculative implementation tasks.
- Steps produce coherent observable results with acceptance checks and real prerequisites. Their material journeys, state transitions, failures, and recovery agree with the visual. Completion criteria are distinct from any draft-publication and consumer-release gates.
- Platform-dependent claims match the intended account, access, and runtime. Proposed setup is not described as already configured.
- For an approved prototype, the plan retains the exact accessible reference, a compact checklist of in-scope surfaces and material states, production behavior to preserve, and authorized deviations. It plans an early rendered checkpoint and final scoped comparison, with any access or fixture prerequisites explicit. Functional checks and fidelity comparison remain separate completion criteria.
A feasibility test may be proposed as an implementation step; Whiteboard does not run it. Implementation checkpoints need not become separate issues, workers, or PRs. For a plan spanning sessions, check that its summary preserves the goal, decisions and reasons, next questions, and blockers without requiring the original conversation. A fresh Orchestrate session should be able to propose execution from the plan alone, without reopening settled choices, dropping acceptance, or allocating blocked dependents. Whiteboard does not preassign workers, branches, or PRs; Orchestrate owns execution grouping, allocation, and delivery.
4. Choose what happens next
When consequential questions are answered, material walkthroughs are complete, and the plan is self-contained, Whiteboard says “This plan is ready for handoff.” It names the appropriate next workflow without starting it. Routine implementation details can remain for execution. If decisions or prerequisites still block part of the plan, it identifies the affected work and keeps asking focused questions. You can stop, narrow the scope, defer a decision, or request the current draft at any point; unresolved work remains marked as unready. Handoff readiness does not prove feasibility, setup, or end-to-end acceptance.
| Next action | What to request |
|---|---|
| Keep the result in chat | Ask for the full plan inline instead of the file default. |
| Choose a durable document | Name the destination, for example: Save this plan to docs/plans/readme-verification.md. Do not commit or implement it. |
| File GitHub issues | Follow Publish a plan as issues. |
| Implement one bounded outcome | Follow Deliver one change. |
| Coordinate several executable outcomes | Follow Coordinate several tasks. |
Temporary files can be cleared; they are not archival storage. Choose a durable destination when you need one. Whiteboard reads existing content and preserves unrelated work before updating an explicit destination. Keep the path in continuation context where your host supports it, and have a resumed session read the file before relying on the plan. A lost path or file prevents guaranteed recovery. If file creation, reading, or sharing fails, expect a disclosed limitation and a supported alternative; if no usable path exists, expect the complete plan inline.
Saving or publishing a plan does not authorize implementation. See the Whiteboard reference for exact planning and publication rules.